Composite readiness score for Singapore covering power availability, fiber proximity, cooling infrastructure, and regulatory velocity.
Singapore scores 81/100 on our AI Readiness Index, earning a "B" rating. Key factors include a 80/100 power score (based on $0.15/kWh local rates), 98/100 fiber connectivity, and 70/100 for permit velocity.
Real-time grid congestion and curtailment risk by zone
Open Free ToolSingapore is a Tier 1 Market with a composite readiness score of 81/100. This market is suitable for deployment with minor infrastructure investments.
Local power costs of $0.15/kWh place Singapore at the higher end of the national cost curve. As a Tier 1 hub, expect 18-24 month interconnection timelines in major substations.
PDF Format • 45 Pages • Instant Access