Readiness Score • 2026 Assessment

Ashburn VA AI Readiness

Composite readiness score for Ashburn VA covering power availability, fiber proximity, cooling infrastructure, and regulatory velocity.

AI Summary • 3 Data Sources Verified

Is Ashburn VA a good location for an AI data center?

Ashburn VA scores 75/100 on our AI Readiness Index, earning a "B" rating. Key factors include a 65/100 power score (based on $0.08/kWh local rates), 98/100 fiber connectivity, and 70/100 for permit velocity.

Key Data Points

  • Overall Score: 75/100 (Band B)
  • Power Score (TTPS): 65/100
  • Fiber Score: 98/100
  • Permit Velocity: 70/100

Financial Tools for Ashburn VA Site Selection

FREE TOOL

TTPS (Time-to-Power Score)

Interconnection queue wait time analysis

Open Free Tool
FREE TOOL

CSS (Curtailment Stress Score)

Real-time grid congestion and curtailment risk by zone

Open Free Tool
PRO TOOL

PAY (Power-Adjusted Yield)

Site-level investment attractiveness scoring

Try Pro Tool
PRO TOOL

Connectivity Analyzer

Evaluate fiber and network connectivity for sites

Try Pro Tool
75
Band B
65
Power
98
Fiber
75
Cooling
70
Permits

Site Selection Analysis: Ashburn VA

Ashburn VA is a Tier 1 Market with a composite readiness score of 75/100. This market is suitable for deployment with minor infrastructure investments.

Power Infrastructure

Local power costs of $0.08/kWh place Ashburn VA at the mid-point of the national cost curve. As a Tier 1 hub, expect 18-24 month interconnection timelines in major substations.

Critical Market Intelligence

The 'Site Selection' Deep Dive

  • The 5 substations in Ohio that still have capacity.
  • Why 'Site Control' is meaningless without power.
  • Full TTPS scores for Ashburn VA queue positions.

Compare Other Markets