Composite readiness score for San Jose CA covering power availability, fiber proximity, cooling infrastructure, and regulatory velocity.
San Jose CA scores 69/100 on our AI Readiness Index, earning a "C" rating. Key factors include a 52/100 power score (based on $0.18/kWh local rates), 98/100 fiber connectivity, and 70/100 for permit velocity.
Real-time grid congestion and curtailment risk by zone
Open Free ToolSan Jose CA is a Tier 1 Market with a composite readiness score of 69/100. Consider additional due diligence on interconnection timelines before committing.
Local power costs of $0.18/kWh place San Jose CA at the higher end of the national cost curve. As a Tier 1 hub, expect 18-24 month interconnection timelines in major substations.