Readiness Score • 2026 Assessment

San Jose CA AI Readiness

Composite readiness score for San Jose CA covering power availability, fiber proximity, cooling infrastructure, and regulatory velocity.

AI Summary • 1 Data Sources Verified

Is San Jose CA a good location for an AI data center?

San Jose CA scores 69/100 on our AI Readiness Index, earning a "C" rating. Key factors include a 52/100 power score (based on $0.18/kWh local rates), 98/100 fiber connectivity, and 70/100 for permit velocity.

Key Data Points

  • Overall Score: 69/100 (Band C)
  • Power Score (TTPS): 52/100
  • Fiber Score: 98/100
  • Permit Velocity: 70/100

Financial Tools for San Jose CA Site Selection

FREE TOOL

TTPS (Time-to-Power Score)

Interconnection queue wait time analysis

Open Free Tool
FREE TOOL

CSS (Curtailment Stress Score)

Real-time grid congestion and curtailment risk by zone

Open Free Tool
PRO TOOL

PAY (Power-Adjusted Yield)

Site-level investment attractiveness scoring

Try Pro Tool
PRO TOOL

Connectivity Analyzer

Evaluate fiber and network connectivity for sites

Try Pro Tool
69
Band C
52
Power
98
Fiber
75
Cooling
70
Permits

Site Selection Analysis: San Jose CA

San Jose CA is a Tier 1 Market with a composite readiness score of 69/100. Consider additional due diligence on interconnection timelines before committing.

Power Infrastructure

Local power costs of $0.18/kWh place San Jose CA at the higher end of the national cost curve. As a Tier 1 hub, expect 18-24 month interconnection timelines in major substations.

Critical Market Intelligence

The 'Site Selection' Deep Dive

  • The 5 substations in Ohio that still have capacity.
  • Why 'Site Control' is meaningless without power.
  • Full TTPS scores for San Jose CA queue positions.

Compare Other Markets