Composite readiness score for Chicago IL covering power availability, fiber proximity, cooling infrastructure, and regulatory velocity.
Chicago IL scores 78/100 on our AI Readiness Index, earning a "B" rating. Key factors include a 65/100 power score (based on $0.07/kWh local rates), 98/100 fiber connectivity, and 70/100 for permit velocity.
Real-time grid congestion and curtailment risk by zone
Open Free ToolChicago IL is a Tier 1 Market with a composite readiness score of 78/100. This market is suitable for deployment with minor infrastructure investments.
Local power costs of $0.07/kWh place Chicago IL at the mid-point of the national cost curve. As a Tier 1 hub, expect 18-24 month interconnection timelines in major substations.