Readiness Score • 2026 Assessment

Dublin IE AI Readiness

Composite readiness score for Dublin IE covering power availability, fiber proximity, cooling infrastructure, and regulatory velocity.

AI Summary • 54 Data Sources Verified

Is Dublin IE a good location for an AI data center?

Dublin IE scores 81/100 on our AI Readiness Index, earning a "B" rating. Key factors include a 80/100 power score (based on $0.12/kWh local rates), 98/100 fiber connectivity, and 70/100 for permit velocity.

Key Data Points

  • Overall Score: 81/100 (Band B)
  • Power Score (TTPS): 80/100
  • Fiber Score: 98/100
  • Permit Velocity: 70/100

Financial Tools for Dublin IE Site Selection

FREE TOOL

TTPS (Time-to-Power Score)

Interconnection queue wait time analysis

Open Free Tool
FREE TOOL

CSS (Curtailment Stress Score)

Real-time grid congestion and curtailment risk by zone

Open Free Tool
PRO TOOL

PAY (Power-Adjusted Yield)

Site-level investment attractiveness scoring

Try Pro Tool
PRO TOOL

Connectivity Analyzer

Evaluate fiber and network connectivity for sites

Try Pro Tool
81
Band B
80
Power
98
Fiber
75
Cooling
70
Permits

Site Selection Analysis: Dublin IE

Dublin IE is a Tier 1 Market with a composite readiness score of 81/100. This market is suitable for deployment with minor infrastructure investments.

Power Infrastructure

Local power costs of $0.12/kWh place Dublin IE at the higher end of the national cost curve. As a Tier 1 hub, expect 18-24 month interconnection timelines in major substations.

Critical Market Intelligence

The 'Site Selection' Deep Dive

  • The 5 substations in Ohio that still have capacity.
  • Why 'Site Control' is meaningless without power.
  • Full TTPS scores for Dublin IE queue positions.

Compare Other Markets