Time-to-Power weekly change object

Ohio / PJM: what moved this week

Track what changed this week in Bankable Time-to-Power Intelligence: timing-risk deltas, queue-link shifts, and shortlist-reorder signals.

Week of Feb 24, 2026·2 market-relevant public signal moves·2 families moved

Need the trust rules first? Review the public methodology.

Timing truth

Ohio / PJM timing-risk posture

This week's timing basis for the Ohio / PJM Time-to-Power Pack. Proxy and unresolved rows are visible, not hidden.

Timing confidence

Medium

pack-level timing confidence grade

Queue-linked

No — proxy or unresolved rows present

whether all resolved rows are queue-linked

Direct vs proxy

80 proxy

sample row basis breakdown

Freshest as of

Unavailable

latest underlying TTPS refresh

Proxy basis present

Basis: Pack TTPS-band proxy basis

Current sample timing still depends on proxy basis rather than queue-linked evidence.

Timing is usable for pack framing, but proxy rows need visible separation.

How timing basis is derived

Signals moved

2

market-relevant public entries this week

Families moved

2

power, water

Current confidence

Medium confidence (66 / 100)

No public week-over-week confidence delta surfaced yet

Current freshness

Current

Current trust posture on the published market object

What moved since the last weekly publish

Ohio / PJM weekly change feed

These are the market-relevant public changes currently surfaced for Ohio / PJM in the weekly feed.

powerPJM Western

PJM Capacity Price

PJM Western hub capacity prices declined 5.7% as new generation came online.

Weekly move

-5.7%

Moved down

waterAshburn, VA

Baseline Stress

Northern Virginia baseline water stress decreased 9.5%, improving datacenter cooling reliability.

Weekly move

-9.5%

Moved down

Current trust posture

What became fresher or staler?

The public weekly feed does not yet publish explicit freshness or confidence deltas. The current published market posture is still what matters for decision use right now.

Power: CurrentConnectivity: CurrentWater: Current

Public confidence delta this week: not separately published. Current confidence remains Medium confidence (66 / 100).

Why it matters

Why this changes the next move

Water moved most this week, which matters because cooling and regulatory constraints can change the practical viability of otherwise attractive sites.

Ohio / PJM is the direct-fact queue market anchor outside ERCOT, so weekly PJM process and power signals can quickly change whether shortlist routes should advance or stay on monitoring hold.

Watchlist bridge

Move from weekly summary into recurring monitoring

This page is the public weekly summary. Speed-to-Power Watchlist is the recurring layer for teams that need alerts, exports, and ongoing monitoring once the market is real.

1. Save the market

Open Speed-to-Power Watchlist and save Ohio / PJM as a tracked market for recurring visibility instead of one-off weekly checks.

2. Track live deltas

Use watchlists and alerts for power, water, and readiness movement once the market deserves a timing recheck or monitoring-priority update.

3. Export when the route is real

Recurring monitoring belongs in Speed-to-Power Watchlist; one-time ranked site diligence still belongs in the Time-to-Power Pack.

Use the weekly summary for what moved now, then open Speed-to-Power Watchlist for recurring monitoring

Sample shortlist rows, export preview, and launchability evidence are visible before purchase. Open the market-specific offer page first when you need proof and scope. Buy the pack when you need a concrete shortlist and export-ready diligence layer. Use the watchlist when you need recurring signal monitoring after initial screening.

Queue evidence freshness

Ohio / PJM: source freshness and process posture

Public summary from the queue evidence bridge. Full row-level evidence, exports, and decision memos stay inside the paid pack/watchlist flow.

Data freshness

Aging (22d old, as of Apr 25, 2026)

Data as of: Apr 25, 2026

Coverage

9,251 rows

9,251 timing signals · 0 change events

Confidence: High

Latest-change teaser

PJM Capacity Price declined 5.7% in PJM Western. PJM Western hub capacity prices declined 5.7% as new generation came online.

Last change date: Feb 24, 2026

Source contract

PJM Planning API interconnection queue export

Source slug: pjm-interconnection-queue

Truth class: Direct Fact

Source tier: Official Public Export

Limitation language

PJM queue evidence comes from the official public Planning API export. Use it as screening-grade decision support only; it does not guarantee parcel-level MW, utility-certified serviceability, interconnection timing, permitting outcomes, or power availability.

Need the row-level evidence?

The paid pack/watchlist includes shortlist rows, source appendix, exports, and decision-memo fields.

Get the Ohio/PJM Time-to-Power Pack

PJM queue data

direct

Ohio / PJM timing evidence uses the official PJM Planning API public export — a direct-fact queue copy. Row-level queue evidence supports stronger timing confidence than proxy-only markets.

Limitations

This score helps early screening, not permitting approval, utility commitment, or parcel-level constructability.

  • This weekly change object summarizes only the public signal-change feed currently available for this market.
  • It does not expose parcel-level changes, utility commitments, or a full historical confidence/freshness time series.
  • Decision support only. Not a utility commitment, parcel-level MW guarantee, interconnection guarantee, energization-date guarantee, or permitting guarantee.
Expand all limitations
  • This weekly change object summarizes only the public signal-change feed currently available for this market.
  • It does not expose parcel-level changes, utility commitments, or a full historical confidence/freshness time series.
  • Decision support only. Not a utility commitment, parcel-level MW guarantee, interconnection guarantee, energization-date guarantee, or permitting guarantee.
  • Screening outputs do not guarantee utility deliverability or energization timing.
  • Parcel-level zoning, title, and entitlement diligence is outside this scoring model.
  • Incentive eligibility may depend on case-specific legal and tax review.
  • Pack preview summarizes screening signals and is not an investment recommendation.
  • Legacy fallback reconciliation is active for 1 site candidate(s); confidence is policy-downgraded.
  • Public market summaries include county/metro scorecards only; site candidates remain internal_only.
Open Readiness Map