ISO Power Market • 2026 Analysis

MISO Data Center Power

Midcontinent Independent System Operator • Midwest

Interconnection analysis for AI data center deployment in the MISO power market. Covers queue timelines, power costs, and market-specific risks.

Summary • 40 Data Sources

Is MISO a good power market for AI data centers?

MISO (Midcontinent Independent System Operator) scores 67/100 on our ISO Readiness Index. Key factors: 24-month average interconnection timeline, $0.05-0.08/kWh power costs, and moderate queue backlog. Lower land costs, available capacity.

Key Data Points

  • Overall Score: 67/100 (Band B)
  • Avg. Interconnection: 24 months
  • Power Costs: $0.05-0.08/kWh
  • Queue Status: Moderate

Primary Paid Handoff

Start with the Texas Time-to-Power Pack for concrete diligence.

Use the one-time Texas pack for ranked shortlist outputs first, then run Speed-to-Power Watchlist for recurring speed-to-power monitoring.

67
Band B
Overall Score
24
Months to Power
$0.05-0.08/kWh
Power Cost
Moderate
Queue Backlog

MISO Market Overview

Lower land costs, available capacity. The MISO region covers Midwest and serves major metros including Minneapolis, Kansas City, Indianapolis.

Interconnection Timeline

Average time-to-power in MISO is 24 months, which is near the national average for large load interconnections.

Key Risks

Limited fiber in some zones. Underwriters should model sensitivity to these factors when evaluating MISO-located assets.

Critical Market Intelligence

MISO Deep Dive Report

  • Complete substation capacity map for Midwest
  • Queue position analysis for pending large load applications
  • Curtailment risk modeling by zone

Explore More

Power Analysis Tools for MISO

FREE TOOL

TTPS (Time-to-Power Score)

Interconnection queue wait time analysis

Buy Texas Time-to-Power Pack
FREE TOOL

CSS (Curtailment Stress Score)

Real-time grid congestion and curtailment risk by zone

Open Speed-to-Power Watchlist

Compare Other Power Markets

Water Risk & Infrastructure Readiness

Evaluating water stress goes hand-in-hand with power and edge network readiness. Datacenters require massive cooling capacity, making municipal water morality and drought risk critical factors in site selection.

PowerWaterEdge

Open Speed-to-Power Watchlist

Track power, water, and edge changes that can reshuffle shortlist timing.

Edge Infrastructure Risk Assessment

Edge readiness is critical for latency-sensitive AI inference workloads. Our Edge Risk Index evaluates fiber density, network latency, and colocation availability across 20+ major markets to help you optimize distributed inference deployments.

PowerWaterEdge

Explore Edge Readiness Scores

View latency metrics, fiber density, and edge colocation availability across all tracked markets.

Power Infrastructure Risk Assessment

Power availability is the primary constraint for AI datacenter deployment. Our Power Risk Index evaluates interconnection queues, curtailment exposure, and behind-the-meter strategies across 20+ major markets to help you de-risk power procurement.

PowerWaterEdge

Explore Power Risk Scores

View interconnection timelines, PPA structures, and curtailment risk across all tracked markets.

Open Readiness Map