ISO Power Market • 2026 Analysis

ERCOT Data Center Power

Electric Reliability Council of Texas • Texas

Interconnection analysis for AI data center deployment in the ERCOT power market. Covers queue timelines, power costs, and market-specific risks.

Summary • 40 Data Sources

Is ERCOT a good power market for AI data centers?

ERCOT (Electric Reliability Council of Texas) scores 74/100 on our ISO Readiness Index. Key factors: 18-month average interconnection timeline, $0.04-0.07/kWh power costs, and high queue backlog. Deregulated market, no capacity payments.

Key Data Points

  • Overall Score: 74/100 (Band B)
  • Avg. Interconnection: 18 months
  • Power Costs: $0.04-0.07/kWh
  • Queue Status: High

Primary Paid Handoff

Start with the Texas Time-to-Power Pack for concrete diligence.

Use the one-time Texas pack for ranked shortlist outputs first, then run Speed-to-Power Watchlist for recurring speed-to-power monitoring.

74
Band B
Overall Score
18
Months to Power
$0.04-0.07/kWh
Power Cost
High
Queue Backlog

ERCOT Market Overview

Deregulated market, no capacity payments. The ERCOT region covers Texas and serves major metros including Dallas–Fort Worth, Austin, San Antonio, Houston.

Interconnection Timeline

Average time-to-power in ERCOT is 18 months, placing it among the faster ISOs for new large load connections.

Key Risks

Curtailment during summer peaks. Underwriters should model sensitivity to these factors when evaluating ERCOT-located assets.

Critical Market Intelligence

ERCOT Deep Dive Report

  • Complete substation capacity map for Texas
  • Queue position analysis for pending large load applications
  • Curtailment risk modeling by zone

Explore More

Power Analysis Tools for ERCOT

FREE TOOL

TTPS (Time-to-Power Score)

Interconnection queue wait time analysis

Buy Texas Time-to-Power Pack
FREE TOOL

CSS (Curtailment Stress Score)

Real-time grid congestion and curtailment risk by zone

Open Speed-to-Power Watchlist

Compare Other Power Markets

Water Risk & Infrastructure Readiness

Evaluating water stress goes hand-in-hand with power and edge network readiness. Datacenters require massive cooling capacity, making municipal water morality and drought risk critical factors in site selection.

PowerWaterEdge

Open Speed-to-Power Watchlist

Track power, water, and edge changes that can reshuffle shortlist timing.

Edge Infrastructure Risk Assessment

Edge readiness is critical for latency-sensitive AI inference workloads. Our Edge Risk Index evaluates fiber density, network latency, and colocation availability across 20+ major markets to help you optimize distributed inference deployments.

PowerWaterEdge

Explore Edge Readiness Scores

View latency metrics, fiber density, and edge colocation availability across all tracked markets.

Power Infrastructure Risk Assessment

Power availability is the primary constraint for AI datacenter deployment. Our Power Risk Index evaluates interconnection queues, curtailment exposure, and behind-the-meter strategies across 20+ major markets to help you de-risk power procurement.

PowerWaterEdge

Explore Power Risk Scores

View interconnection timelines, PPA structures, and curtailment risk across all tracked markets.

Open Readiness Map