Richmond VA Datacenter Market
Comprehensive AI infrastructure analysis for Richmond VA. Power, water, edge, and colocation metrics.
What is the AI datacenter market like in Richmond VA?
Richmond VA is a Tier 2 AI datacenter market with power costs of $0.07/kWh. The market has 8 active sites, water stress score of 45/100 (Medium risk), and edge readiness of 60/100 (Good).
Key Data Points
- Power Cost: $0.07/kWh
- Active Sites: 8
- Water Stress: 45/100 (Medium)
- Edge Readiness: 60/100
Explore More
Infrastructure Tools for Richmond VA
PAY (Power-Adjusted Yield)
Site-level investment attractiveness scoring
Open Speed-to-Power WatchlistInfrastructure Deep Dives
Explore detailed infrastructure data for Richmond VA.
Power & Grid
Water Stress
Edge Readiness
Market Stats
Methodology
This market report aggregates data from multiple indices to provide a comprehensive view of Richmond VAsuitability for AI datacenter deployment. Each metric is scored on a 0-100 scale with defined risk categories.
Data Sources
- Power costs: Regional utility filings and commercial rates
- Water stress: EPA WaterSense and US Drought Monitor
- Edge readiness: Network latency and fiber density measurements
- Site inventory: Market colocation provider database
The 'Market Intelligence' Chapter
- Download full market report for Richmond VA.
- Investment opportunity analysis by tier.
- Competitive landscape and provider comparison.
Need format proof first? View sample output
Recent Market Changes
Phoenix water stress score increased to 78.4, indicating higher drought risk for datacenter cooling.
Dallas-Fort Worth water stress score rose 7.4% as drought conditions intensified.
Northern Virginia baseline water stress decreased 9.5%, improving datacenter cooling reliability.
Last updated: 2026-05-17 • Data sources: WSA Analytics • Methodology