Market Report • Tier 1

Chicago IL Datacenter Market

Comprehensive AI infrastructure analysis for Chicago IL. Power, water, edge, and colocation metrics.

Summary • 8 Data Sources

What is the AI datacenter market like in Chicago IL?

Chicago IL is a Tier 1 AI datacenter market with power costs of $0.07/kWh. The market has 15 active sites, water stress score of 35/100 (Low risk), and edge readiness of 75/100 (Excellent).

Key Data Points

  • Power Cost: $0.07/kWh
  • Active Sites: 15
  • Water Stress: 35/100 (Low)
  • Edge Readiness: 75/100
$0.07
per kWh
PJM
ISO Region
15
Active Sites
Tier 1
Market Tier

Explore More

Infrastructure Tools for Chicago IL

PRO TOOL

PAY (Power-Adjusted Yield)

Site-level investment attractiveness scoring

Open Speed-to-Power Watchlist
PRO TOOL

LCOC Calculator

Levelized Cost of Compute analysis

Open Speed-to-Power Watchlist

Infrastructure Deep Dives

Explore detailed infrastructure data for Chicago IL.

Power & Grid

Power Cost$0.07/kWh
ISO RegionPJM
Market Vacancy3.5%

Water Stress

WSS Score35/100
Risk LevelLow

Edge Readiness

ERI Score75/100
ReadinessExcellent

Market Stats

Active Sites15
Market TierTier 1
Vacancy Rate3.5%

Methodology

This market report aggregates data from multiple indices to provide a comprehensive view of Chicago ILsuitability for AI datacenter deployment. Each metric is scored on a 0-100 scale with defined risk categories.

Data Sources

  • Power costs: Regional utility filings and commercial rates
  • Water stress: EPA WaterSense and US Drought Monitor
  • Edge readiness: Network latency and fiber density measurements
  • Site inventory: Market colocation provider database
Critical Market Intelligence

The 'Market Intelligence' Chapter

  • Download full market report for Chicago IL.
  • Investment opportunity analysis by tier.
  • Competitive landscape and provider comparison.

Recent Market Changes

Water Stress Score↑ 8.4%

Phoenix water stress score increased to 78.4, indicating higher drought risk for datacenter cooling.

Phoenix, AZ • 2026-02-24
Water Stress Score↑ 7.4%

Dallas-Fort Worth water stress score rose 7.4% as drought conditions intensified.

Dallas-Fort Worth, TX • 2026-02-24
Baseline Stress↓ 9.5%

Northern Virginia baseline water stress decreased 9.5%, improving datacenter cooling reliability.

Ashburn, VA • 2026-02-24

Last updated: 2026-05-17 • Data sources: WSA Analytics • Methodology

Open Readiness Map