Des Moines IA Datacenter Market
Comprehensive AI infrastructure analysis for Des Moines IA. Power, water, edge, and colocation metrics.
What is the AI datacenter market like in Des Moines IA?
Des Moines IA is a Tier 2 AI datacenter market with power costs of $0.045/kWh. The market has 8 active sites, water stress score of 45/100 (Medium risk), and edge readiness of 60/100 (Good).
Key Data Points
- Power Cost: $0.045/kWh
- Active Sites: 8
- Water Stress: 45/100 (Medium)
- Edge Readiness: 60/100
Explore More
Infrastructure Tools for Des Moines IA
PAY (Power-Adjusted Yield)
Site-level investment attractiveness scoring
Open Speed-to-Power WatchlistInfrastructure Deep Dives
Explore detailed infrastructure data for Des Moines IA.
Power & Grid
Water Stress
Edge Readiness
Market Stats
Methodology
This market report aggregates data from multiple indices to provide a comprehensive view of Des Moines IAsuitability for AI datacenter deployment. Each metric is scored on a 0-100 scale with defined risk categories.
Data Sources
- Power costs: Regional utility filings and commercial rates
- Water stress: EPA WaterSense and US Drought Monitor
- Edge readiness: Network latency and fiber density measurements
- Site inventory: Market colocation provider database
The 'Market Intelligence' Chapter
- Download full market report for Des Moines IA.
- Investment opportunity analysis by tier.
- Competitive landscape and provider comparison.
Need format proof first? View sample output
Recent Market Changes
Phoenix water stress score increased to 78.4, indicating higher drought risk for datacenter cooling.
Dallas-Fort Worth water stress score rose 7.4% as drought conditions intensified.
Northern Virginia baseline water stress decreased 9.5%, improving datacenter cooling reliability.
Last updated: 2026-05-17 • Data sources: WSA Analytics • Methodology