ERCOT ERCOT West — Curtailment Risk
Real-time Curtailment Severity Score (CSS) for the ERCOT West zone, tracking negative price hours and generation curtailment over a 30-Day rolling window.
What is the curtailment risk in ERCOT west zone?
The 30-Day Curtailment Severity Score (CSS) for ERCOT ERCOT West is 75/100, rated as "High" risk. Over this period, there were 150 negative price hours and 0.8% of generation was curtailed.
Key Data Points
- CSS Score: 75/100
- Risk Band: High
- Negative Price Hours: 150
- Curtailed MWh Share: 0.8%
Risk Analysis: ERCOT West
The ERCOT West zone is experiencing elevated curtailment stress. With 150 negative price hours in the past 30-day window, operators should consider power purchase agreements (PPAs) with explicit curtailment provisions or explore behind-the-meter (BTM) solutions to hedge against grid instability.
Historical Context
ERCOT has seen a significant increase in renewable generation, particularly wind in the West, Panhandle, and Far West zones. This has led to periodic negative pricing when wind generation exceeds demand. Data centers with flexible load profiles can exploit these periods for low-cost inference processing.
The 'Grid Bottleneck' Report
- The 5 substations in Ohio that still have capacity.
- Why ERCOT West is a curtailment trap.
- Full CSS timeseries for all ERCOT zones.
Need format proof first? View sample output
Explore More
Related Tools
TTPS (Time-to-Power Score)
Interconnection queue wait time analysis
Buy Texas Time-to-Power PackCSS (Curtailment Stress Score)
Real-time grid congestion and curtailment risk by zone
Open Speed-to-Power WatchlistPAY (Power-Adjusted Yield)
Site-level investment attractiveness scoring
Open Speed-to-Power WatchlistERCOT Curtailment Details
Detailed ERCOT curtailment events and forecasts
Open Speed-to-Power Watchlist