Tier 1 Market • 2026 Benchmark

AI Colocation Pricing — Dublin IE

Real-time lease rate benchmarks for liquid-cooling-ready facilities in Dublin IE. Compare Tier 1 pricing against national averages.

AI Summary • 87 Data Sources Verified

How much does AI colocation cost in Dublin IE?

AI-ready colocation in Dublin IE costs approximately $250/kW for air-cooled deployments and $313/kW for liquid-cooled racks at 100kW+ densities. Current market vacancy is 3%.

Key Data Points

  • Air-Cooled Base: $250/kW
  • Liquid-Cooled Premium: +$63/kW
  • Market Vacancy: 3%
  • Avg. Lead Time: 18 months
  • Tracked Sites: 12+
Power Cost Basis
$0.12/kWh
100kW+
Liquid-Cooled
$313/kW
Market Vacancy
3%

Market Analysis: Dublin IE

Dublin IE is classified as a Tier 1 Market for AI infrastructure deployment. As a hyperscale hub, expect longer lead times (18+ months) and premium pricing, but with superior fiber connectivity and established vendor ecosystems.

Density Tiers & Cooling Requirements

Density TierkW/RackCooling TypeEst. Price
Standard10-20 kWAir (DX/CRAC)$200/kW
High-Density40-60 kWRear-Door HX$250/kW
AI-Ready80-120 kWDirect-to-Chip Liquid$313/kW
Critical Market Intelligence

The "Dublin IE" Deep Dive

  • Why Tier 1 vacancy is tightening.
  • The $120/kW colocation arbitrage map.
  • Full list of liquid-cooling-ready providers.

Related Tools

PRO TOOL

Colocation Pricing

Metro-level colocation cost analysis with market data

Try Pro Tool
FREE TOOL

Site Readiness Scores

Project readiness assessments across permitting, interconnection, construction

Open Free Tool
PRO TOOL

PAY (Power-Adjusted Yield)

Site-level investment attractiveness scoring

Try Pro Tool

Explore More Markets

Compare pricing and availability across all Tier 1 and Tier 2 AI colocation hubs.

GPU Lease Index