Power Grid Data • PJM

Pene PJM Power Data

Real-time power grid metrics and interconnection data for Pene in the PJM grid region.

Summary8 Data Sources

What is the time-to-power score for Pene in PJM?

The Pene zone in PJM has a time-to-power score of 48 months, indicating medium interconnection delays. The curtailment stress score is 35/100 (Low risk).

Key Data Points

  • Time-to-Power: 48 months
  • Curtailment Risk: 35/100
  • Grid Status: Medium delay risk
  • Zone: Pene

Explore More

Infrastructure Tools for PJM

FREE TOOL

TTPS (Time-to-Power Score)

Interconnection queue wait time analysis

Buy Texas Time-to-Power Pack
FREE TOOL

CSS (Curtailment Stress Score)

Real-time grid congestion and curtailment risk by zone

Open Speed-to-Power Watchlist
PRO TOOL

PAY (Power-Adjusted Yield)

Site-level investment attractiveness scoring

Open Speed-to-Power Watchlist
PRO TOOL

Connectivity Analyzer

Evaluate fiber and network connectivity for sites

Open Speed-to-Power Watchlist

Time-to-Power

48
months average
Medium interconnection risk

Curtailment Stress

35
/ 100 score
Low curtailment exposure

Methodology

The Time-to-Power (TTPS) score represents the estimated months from interconnection request to commercial operation, based on historical queue data from PJM. The Curtailment Stress Score (CSS) measures renewable energy curtailment risk as a percentage of potential generation.

Data Sources

  • PJM interconnection queue data
  • Regional transmission operator reports
  • Historical curtailment events
Critical Market Intelligence

The 'Grid Infrastructure' Chapter

  • Download interconnection queue analysis for all ISO zones.
  • Time-to-power projections by scenario.
  • Curtailment mitigation strategies.

Recent Market Changes

ERCOT Spot Price 16.8%

ERCOT Houston hub spot prices increased 16.8% week-over-week due to higher demand and lower wind output.

ERCOT Houston2026-02-24
PJM Capacity Price 5.7%

PJM Western hub capacity prices declined 5.7% as new generation came online.

PJM Western2026-02-24
MISO Queue Additions 9%

MISO interconnection queue grew by 9% with 22 new AI datacenter project requests.

MISO Central2026-02-24

Last updated: 2026-05-17 • Data sources: ISO/RTO Public Data Methodology

Open Readiness Map