Grid Interconnection Request • PJM
Queue Position AC1-008 Analysis
Summary • 130 Data Sources
What is the status of interconnection queue position AC1-008?
Queue position AC1-008 in PJM has a TTPS Score of 76/100 (Band B). Our model predicts a 58% probability of reaching commercial operation within 24 months.
Key Data Points
- TTPS Score: 76 (Band B)
- ISO Region: PJM
- 24mo Success Prob: 58%
- Status: Active / Under Study
Viability Score
76
/ 100
BAND B
12 Month Success
21%
18 Month Success
41%
24 Month Success
58%
Project Risk Assessment
Queue position AC1-008 shows moderate technical viability. Historical analysis of PJM queues suggests that projects with this score profile have a 58% chance of navigating the study process without triggering excessive network upgrade costs.
Specific Risk Factors
Queue progression model; Above-average timeline confidence; Standard interconnection process
Critical Market Intelligence
Grid Interconnection Tactics
- Deep dive into PJM cluster studies.
- How to negotiate Network Upgrade assignments.
- Map of constrained substations near this project.
Buy the Texas packOne-time snapshot • self-serve checkout
Need format proof first? View sample output
Explore More
Related Tools
FREE TOOL
TTPS (Time-to-Power Score)
Interconnection queue wait time analysis
Buy Texas Time-to-Power PackFREE TOOL
CSS (Curtailment Stress Score)
Real-time grid congestion and curtailment risk by zone
Open Speed-to-Power WatchlistPRO TOOL
PAY (Power-Adjusted Yield)
Site-level investment attractiveness scoring
Open Speed-to-Power WatchlistPRO TOOL
Connectivity Analyzer
Evaluate fiber and network connectivity for sites
Open Speed-to-Power Watchlist