Grid Interconnection Request • ERCOT

Queue Position 30INR0071 Analysis

Summary • 130 Data Sources

What is the status of interconnection queue position 30INR0071?

Queue position 30INR0071 in ERCOT has a TTPS Score of 63/100 (Band B). Our model predicts a 51% probability of reaching commercial operation within 24 months.

Key Data Points

  • TTPS Score: 63 (Band B)
  • ISO Region: ERCOT
  • 24mo Success Prob: 51%
  • Status: Active / Under Study

Viability Score

63
/ 100
BAND B
12 Month Success
18%
18 Month Success
36%
24 Month Success
51%

Project Risk Assessment

Queue position 30INR0071 shows moderate technical viability. Historical analysis of ERCOT queues suggests that projects with this score profile have a 51% chance of navigating the study process without triggering excessive network upgrade costs.

Specific Risk Factors

Queue progression model; Moderate timeline risk; Standard interconnection process

Critical Market Intelligence

Grid Interconnection Tactics

  • Deep dive into ERCOT cluster studies.
  • How to negotiate Network Upgrade assignments.
  • Map of constrained substations near this project.

Explore More

Related Tools

FREE TOOL

TTPS (Time-to-Power Score)

Interconnection queue wait time analysis

Buy Texas Time-to-Power Pack
FREE TOOL

CSS (Curtailment Stress Score)

Real-time grid congestion and curtailment risk by zone

Open Speed-to-Power Watchlist
PRO TOOL

PAY (Power-Adjusted Yield)

Site-level investment attractiveness scoring

Open Speed-to-Power Watchlist
PRO TOOL

Connectivity Analyzer

Evaluate fiber and network connectivity for sites

Open Speed-to-Power Watchlist
Open Readiness Map