Grid Interconnection Request • CAISO
Queue Position 2166 Analysis
Summary • 130 Data Sources
What is the status of interconnection queue position 2166?
Queue position 2166 in CAISO has a TTPS Score of 67/100 (Band B). Our model predicts a 53% probability of reaching commercial operation within 24 months.
Key Data Points
- TTPS Score: 67 (Band B)
- ISO Region: CAISO
- 24mo Success Prob: 53%
- Status: Active / Under Study
Viability Score
67
/ 100
BAND B
12 Month Success
19%
18 Month Success
38%
24 Month Success
53%
Project Risk Assessment
Queue position 2166 shows moderate technical viability. Historical analysis of CAISO queues suggests that projects with this score profile have a 53% chance of navigating the study process without triggering excessive network upgrade costs.
Specific Risk Factors
Queue progression model; Moderate timeline risk; Standard interconnection process
Critical Market Intelligence
Grid Interconnection Tactics
- Deep dive into CAISO cluster studies.
- How to negotiate Network Upgrade assignments.
- Map of constrained substations near this project.
Buy the Texas packOne-time snapshot • self-serve checkout
Need format proof first? View sample output
Explore More
Related Tools
FREE TOOL
TTPS (Time-to-Power Score)
Interconnection queue wait time analysis
Buy Texas Time-to-Power PackFREE TOOL
CSS (Curtailment Stress Score)
Real-time grid congestion and curtailment risk by zone
Open Speed-to-Power WatchlistPRO TOOL
PAY (Power-Adjusted Yield)
Site-level investment attractiveness scoring
Open Speed-to-Power WatchlistPRO TOOL
Connectivity Analyzer
Evaluate fiber and network connectivity for sites
Open Speed-to-Power Watchlist